Skip to content

Needs-from-Yose ledger

Single owner of everything that needs Yose's hands. Ordered by urgency; keys and signups last (standing rule). 00_FRAMING §8 points here; do not duplicate this list elsewhere.

Time-critical (July 2026, updated with feasibility scout 2026-07-05)

0a. Legalitas sprint (July): NIB with KBLI 62010/62015/62090 confirmed on PT ADK's OSS profile, LPSE/SIKaP registration, letterhead + company profile PDF. New-company track record is NOT a legal blocker (under-3-years exemption verified); KSWP exempts entities not yet obligated to file SPT. 0b. Audiensi request via sekpri (July-August): facilitation and scheduling only, the clean line is "relasi berhenti di pintu ruang rapat". Target: Diskominfo + Bapperida, live demo in Nabire in August. Twin ask: fungsi "digitalisasi titik layanan" into Diskominfo PPAS 2027 (Smart Province sub-kegiatan + RAP Otsus via SIPPP) and a PKS pilot tanpa anggaran (Permendagri 22/2020). 0c. Self-funded pilot decision (Sep-Dec): 1-2 nodes at own cost is the qualification path for RKA 2027. Interacts with the zero-spend constraint: needs a funding source (RIIM? Indigo? savings?) or a software-only pilot variant. Yose call. 0d. Katalog lokal etalase ask: Papua Tengah katalog lokal exists (14 etalase) but likely no IT/services etalase; ask Biro PBJ to open one, or route via katalog nasional v6.

3a. RIIM campus partner by mid-July: BRIN RIIM Kompetisi Batch 2 closes 31 July 2026 and needs a research partner (Uncen network?). Decide go/no-go this week. 3b. Phone-verify KUA-PPAS 2027 status with a Bapperida or DPRD Papua Tengah contact before we send anything (province historically runs about 2 months late; the window may still be open). 3c. Review + sign the Nabire package (drafted, waiting on you): surat audiensi (2 varian), concept note v0.2, ringkasan eksekutif 2 hal (proposal/01), profil perusahaan (proposal/drafts/2026-07_profil-perusahaan.md, fill the [placeholder] legal fields from your documents), GAMBAR pack (proposal/gambar/index.html, open in browser, print to PDF landscape). Then letterhead + signature. Read it all on the go: abstraksi.pages.dev sidebar "proposal" + /gambar-pack (11 visuals inline).

3e. Review proposal v5.0 (NEW 2026-07-11, the big one): read /proposal/05_v50-master end to end (or the docx in your phone's Download folder / abstraksi.pages.dev/Aksara_Proposal_v5_0.docx). Your review is the gate for v5.0 replacing v4.1 as canonical. Specifically check: (a) figures render in your phone's docx viewer (Word mobile/GDocs = yes, WPS = unverified); (b) the D09 license table; (c) the Telegram-first channel framing in §29; (d) the §49 funding table and procurement ladder; (e) docx styling (Kertas Dinas tokens) reads as intended. Derived docs (exec summary, concept note) get re-derived AFTER your pass. 3d. Nabire trip decision: August window for the in-person meeting.

Relationships and doors (July-August, APBD window)

  1. Nabire contacts: which doors can you personally open, and when: Bapperida Papua Tengah, Diskominfo, Setda, MRP, DPMK. Full ask list in research/2026-07-05_apbd-otsus-window.md ("Yang butuh tangan Yose" section).
  2. Legal counsel candidate for CARE threshold-signing review and wali-data vehicle (Uncen hukum adat network?). Needed before care/02 spec finalizes.
  3. Dewan/community anchors: first Mee council conversation about ruang komunitas governance and consent tiers (who would sit on the first dewan kustodian?).

Materials

  1. Official template samples: one anonymized surat domisili + SKTM from a Papua Tengah kelurahan or kampung, for pixel-faithful aksara-cli templates.
  2. Ruang Mee seeding list: ~10 committed early posters, 1-2 moderator candidates you trust.
  3. Voice samples decision: whether to start Common Voice Mee initiation now (needs a native-speaker sponsor group).

Memori Aksara / company brain (new 2026-07-10)

  1. Five memory decisions queued in research/2026-07-10_memory-brain-landscape.md (needs-from-Yose section). First and biggest: ratify the proposed D17 refinement (markdown files = source of truth, SQLite demoted to rebuildable index). Also: .aksara naming, decoupled-standard vs category-in-aksara-cli (research verdict: decouple; aksara-cli stays the only consent-gated writer). Lane B blessed 2026-07-10; full D20 bundle in specs/memori-aksara/01_arsitektur.md §7, all evidence now in.

  2. Five-minute phone probe: push a short Indonesian voice clip through the MOSS-Transcribe-Diarize demo Space (https://huggingface.co/spaces/OpenMOSS-Team/MOSS-transcribe-diarize) and see if it emits usable Indonesian. Settles the UNVERIFIED language question at zero cost; result decides whether the fine-tune play (voice report §A) moves up the roadmap.

Device hardware (new 2026-07-10, gated on funding decision 0c)

  1. BOM hands (details in specs/device/01_bom.md §6): (a) Waveshare-direct price check for the FLEXIBLE 10.3 inch SKU (resellers verified at USD 199.89-214.18, direct unverified); (b) fingerprint module pick for the cap-jempol bolt head (R503 class, Rp 175-300 rb local) + a machining quote for the O~25 bolt-head integration; (c) JLC3DP STL instant quote ONLY IF local cassette bend/CNC quotes fail. None of this is bought before 0c names a funding source.

  2. Display path: DECIDED A + B (Yose 2026-07-11) — EE03 kit for the demo unit (BOM updated, roll-up now Rp 8.2-10.1 jt) plus ONE Waveshare 7.5 inch HAT in the same cart to physically test the size floor ("Aksara Lite" candidate). Remaining hands when 0c opens the wallet: Seeed cart (EE03 $114.90 + 7.5" $56.99 + ID shipping quote at checkout) and the phone spot-checks in research/2026-07-11_cheap-display-paths.md needs-from-Yose. Purchases still gated on 0c.

Accounts and keys (LAST, when builds need them)

9b. Optional hardening of the live docs site: it is PUBLIC-for-now by your call (2026-07-10, "just for me to read easily on the go"), with X-Robots-Tag: noindex so search engines skip it. When ready: put Cloudflare Access in front (Zero Trust dashboard, an Access application over abstraksi.pages.dev, policy = your email, free under 50 users) or take it down (wrangler pages project delete abstraksi).

  1. Oracle Cloud free-tier account (VM wave).
  2. Telegram bot token, then WhatsApp Business number (channel wave).
  3. Domain decision for the public ETNOS instance.
  4. piefed.social 2-secret blocker (per honai-metro memory) when we self-host or deepen the borrowed-backend integration.

Agentic implementation gates (new 2026-07-21)

  1. Ratify D21 after the first aksara-agent spike: stock Hermes Agent as the v0.x reference runtime, with Aksara shipped as standalone plugins, profiles, MCP integrations, and conformance tests. The proof gate is a public PieFed mention handled by an isolated profile without access to signing keys or canonical-memory promotion. H0 scaffold shipped 2026-07-21 in the private aksara-agent repo with 17 green tests; live sandbox proof remains open.

Delivered / resolved

  • 2026-07-21: prototype boolean consent removed from aksara-cli. Plan-bound approval requests and Ed25519 evidence now bind plan, actor, scope, purpose, expiry, and nonce; revocation/replay/tamper tests and cross-language fixtures are green in CI. This closes former gate 19. Production approver identity and key custody remain a separate C2 operational gate.
  • 2026-07-10: aksara-papan renamed to aksara-ui (Yose call; family = aksara-cli / aksara-mem / aksara-ui). GitHub redirects the old URL; local dir, remote, package.json, README, hub pointers all swept.
  • 2026-07-10: HUB DOCS SITE IS LIVE at abstraksi.pages.dev — Yose added the 2 CF secrets, deploy green, homepage + deep routes + llms.txt + blueprint verified 200. Public-for-now (his call), noindex'd; hardening options moved to 9b.
  • 2026-07-05: ETNOS ALPHA IS LIVE at etnos.pages.dev — Yose added the 2 CF secrets, deploy run green, / and /agen verified. The 2-secret blocker (formerly item 13-adjacent) is CLOSED; deploys are now push-to-main.
  • 2026-07-05: D01-D16 ALL SETTLED (Yose yes-to-all + license/naming call). Specs are unblocked.